Company intelligence

Kairos Power

As of September 21, 2026, Kairos Power has raised at least $70M in equity across 1 sourced funding round.

NuclearAlameda, USAFounded 2016Website ↗See connections →

Kairos Power at a glance

As of
Equity raised
$70M[1]
Across 1 sourced roundDerived
Lead investors
Samsung C&T[2]
Funding round · September 2026
Founded
2016[3]
Headquarters
Alameda, USA[4]
  1. [1] Equity raised: Sum of the 1 sourced equity round in the funding history below (debt, tender offers and rumored rounds excluded), September 21, 2026
  2. [2] Lead investors: TechCrunch, September 21, 2026
  3. [3] Founded: Wikidata (retrieved October 4, 2026)
  4. [4] Headquarters: Wikidata (retrieved October 4, 2026)

What Kairos Power does

Kairos Power is developing the fluoride salt-cooled, high-temperature reactor, which it calls the KP-FHR.[1] The company was founded in 2016.[1] Its headquarters are in a converted aircraft hangar at the former Alameda Naval Air Station in California.[2] Its Manufacturing Development Campus in Albuquerque, New Mexico, fabricates and tests reactor systems and handles fuel development and salt production.[2] Kairos says its team numbers more than 500 people.[2] Its reactors use TRISO coated particle fuel and Flibe molten fluoride salt coolant.[1] Kairos is building the Hermes low-power demonstration reactor in Oak Ridge, Tennessee, where nuclear construction began in 2025.[1],[3] In April 2026 it broke ground on Hermes 2 at the same site, its first commercial-scale reactor.[1],[4] Hermes 2 is the first deployment under Kairos' agreement with Google to develop a fleet of advanced reactors.[1] It will supply up to 50 megawatts to the Tennessee Valley Authority grid to serve Google data centers in Tennessee and Alabama.[1] The NRC issued construction permits for Hermes 2 in December 2024.[3] Reactor equipment modules for Hermes 2 are fabricated in Albuquerque and shipped to Oak Ridge for assembly.[1] In September 2026 Samsung C&T signed a binding term sheet to provide up to $100 million through direct investment and in-kind engineering services, subject to regulatory approval.[5],[4] Korea's Chosun Biz reported the investment portion at about $70 million.[4] Samsung C&T will join Kairos' engineering, procurement and construction team and has priority rights for EPC work on its planned U.S. commercial reactors.[3]

Leadership

  • Mike Laufer is CEO and co-founder.[3]
  • Ed Blandford is chief technology officer and co-founder.[3]

Kairos Power profile

written 2026-10-24

Kairos Power builds fluoride salt-cooled nuclear reactors; Samsung C&T pledged up to $100M in Sept 2026 and the company has not disclosed a valuation.

What Kairos Power does

Kairos Power develops advanced nuclear reactors built around a fluoride salt-cooled, high-temperature reactor design, which it abbreviates KP-FHR. Kairos Power describes itself as a vertically integrated nuclear development company with multiple facilities, and its stated goal is to deliver reliable, affordable energy at scale.[1],[2]

Kairos Power makes reactor components, plant equipment modules, fuel and molten salt coolant in-house. Its website says this is done to control quality and drive down costs. The company also says it builds and tests real hardware and feeds the results back into the design, which it calls iterative development.[2],[3]

Kairos Power states its mission as enabling the world's clean energy transition to improve people's quality of life while protecting the environment. The company argues that nuclear is an essential part of the answer to rising demand for clean and reliable power.[3]

Kairos Power says its name comes from a Greek word for the right or opportune moment. The company's about page ties that timing to the natural gas plants built in the early 2000s, which it says will reach end of life in the 2030s and 2040s, and says it intends its reactors to be a competitive carbon-free replacement for that baseload power.[1]

History

Kairos Power was founded in 2016, according to the company's own press release boilerplate. The company says it started with co-founders who saw an opportunity to combat climate change by reimagining nuclear energy and the wider energy system, and that it has since grown from a startup into a vertically integrated nuclear development company.[4],[1]

Kairos Power received the first U.S. construction permit for a non-water-cooled reactor in over 50 years in 2023, according to the company. Its about page identifies Hermes 1 as that first non-water-cooled reactor to receive a Nuclear Regulatory Commission construction permit, and its April 2026 release says Hermes 1 began nuclear construction at the Oak Ridge site in 2025.[5],[1],[4]

Kairos Power broke ground on the Hermes 2 Demonstration Plant in Oak Ridge in April 2026. The company says Hermes 2 is its first commercial-scale reactor and the first power-producing Generation IV reactor to receive a construction permit from the U.S. Nuclear Regulatory Commission. The Commission issued the Hermes 2 construction permits in December 2024. Hermes 2 is designed to be grid-connected at 50 megawatts of electric output, and Kairos Power says it will supply up to 50 megawatts of clean electricity to the Tennessee Valley Authority grid.[4],[5],[6]

Funding

Kairos Power announced on September 21, 2026 that Samsung C&T agreed to provide up to $100 million through a combination of direct investment and in-kind engineering services. The commitment is subject to regulatory approvals and is meant to support delivery of the Hermes 2 Demonstration Plant. The company said a binding term sheet had been signed, so the money is pledged rather than received.[5],[6],[4]

Kairos Power's Samsung C&T deal was reported with a different figure by Chosun Biz, a Korean business outlet. Chosun Biz reported on September 22, 2026 that Samsung C&T would pursue an investment of about $70 million. The two figures are not reconciled in the sources reviewed, and the company's own figure, up to $100 million including in-kind engineering services, is the one to rely on.[7],[5]

Kairos Power has not disclosed a valuation, and none of the sources reviewed lists a priced equity round, a total amount raised or a full list of outside investors. The Samsung C&T commitment is a strategic investment attached to one project rather than a disclosed venture round.[5],[2]

People

Kairos Power's leadership page lists Mike Laufer as Chief Executive Officer and co-founder, and Edward Blandford as Chief Technology Officer and co-founder. Laufer is quoted in the Samsung C&T announcement as CEO and co-founder of Kairos Power.[1],[5]

Kairos Power lists Ignacio Redondo as Chief Financial Officer, and its homepage shows a September 2, 2026 update titled "Kairos Power Appoints Ignacio Redondo as Chief Financial Officer". The leadership page also lists Jeffrey Olson as Vice President, Commercial & Corporate Development.[1],[2]

Kairos Power says its team has grown past 500 people. The company's about page carries the line "500+ people, one mission", and its locations page says the team of 500+ continues to grow.[1],[8]

Customers and partners

Kairos Power's Hermes 2 plant is its first deployment under what the company calls a landmark deal with Google to develop an advanced reactor fleet. The plant will supply electricity to the Tennessee Valley Authority grid, which the company says will help decarbonize Google data centers in Tennessee and Alabama. Commercial terms of the Google agreement are not disclosed in the sources reviewed.[4]

Kairos Power's homepage says it is collaborating with Google, the Tennessee Valley Authority and U.S. utilities on new models for advanced nuclear deployment. Barnard Construction Company is the general contractor for both Hermes reactor projects, and Samsung C&T has agreed to join the Kairos Power-led engineering, procurement and construction team.[2],[4],[5]

Its headquarters is at the former Alameda Naval Air Station in Alameda, California. Its Manufacturing Development Campus is in Albuquerque, New Mexico, where it fabricates and tests reactor systems and develops fuel and salt production. Its Reactor Demonstration Campus is at the East Tennessee Technology Park in Oak Ridge, which hosts the Hermes reactor series.[8]

Is something wrong on this page?

Recent changes

  1. Sep 21, 2026Raised $70M TechCrunch

Funding history

1 equity event · newest first · sources dated per row
DateRoundAmountValuationLead investorsSource
Sep 21, 2026Funding round$70M—TechCrunch

Equity only. “Equity raised” above sums the rounds with a dated, linked source; rumored rounds, tender offers and secondary sales are listed but not counted, and debt financing is listed separately.

Investors

Latest Pulse

  1. Valar Atomics Sues Its Own Investor Over $1B RoundValar Atomics is suing early investor Day One Ventures in Delaware court over how its roughly $1 billion Series B was allocated and whether pro-rata rights were improperly stripped before closing.→
  2. Alibaba Unveils AI Chip, Plans 20GW Of Data CentersAlibaba unveiled a new Zhenwu V900 AI accelerator that triples its predecessor's performance and set a target of 20 gigawatts of global data center capacity by 2032, days before the Trump-Xi summit puts AI chip policy back on the table.→
  3. Newcleo Begins Nasdaq Trading After $2.4B SPAC MergerNewcleo, a French-Italian startup building lead-cooled small modular reactors fueled by recycled nuclear waste, began trading on Nasdaq under ticker NWCL after closing a $2.4 billion SPAC merger with NewHold Investment Corp III.→
  4. Why Specialist Funds Are Closing Faster Than GeneralistsThree new funds closed this month with a combined $1.53 billion in fresh capital -- Intrepid's $525M AI fund, Matter's $450M hardtech fund and Temporal's $550M round -- all narrowly focused rather than generalist bets.→
  5. Samsung Puts Up To $100M Into Kairos's Google ReactorSamsung C&T agreed to provide up to $100 million in combined equity and engineering support to Kairos Power's 50-megawatt demonstration reactor being built to supply Google with nuclear power by 2030.→
  6. Valar Atomics Raises $1B at $6B for Factory NuclearSequoia led a $1B Series B for Valar Atomics at a $6B post-money valuation, tripling the mark it carried in April, weeks after the startup used a fission reaction to power an Nvidia AI chip.→
  7. Sequoia Leads $1B Round for Nuclear Startup ValarValar Atomics closed a $1B Series B led by Sequoia at a $6B valuation, tripling its April mark, weeks after its microreactor became the first in US history to power an Nvidia AI chip.→
  8. Sequoia Leads $1B Bet on Mass-Produced Nuclear ReactorsNuclear startup Valar Atomics raised a $1 billion Series B led by Sequoia Capital at a $6 billion valuation, tripling its valuation as it works to mass-produce small reactors to power AI data centers.→
  9. Antares Raises $470M for Military MicroreactorsNuclear startup Antares raised a $470 million Series C to build small modular reactors for US military bases, part of a Pentagon program racing to bring domestic reactors online by 2028 under a Trump executive order.→
  10. Antares Nuclear Raises $470M For Military MicroreactorsAntares Nuclear raised a $470 million Series C led by Paradigm and Caffeinated Capital to deploy small nuclear microreactors that can power US military bases independent of the civilian grid by 2028.→

Coverage Timeline

newest first
  1. Sep 21, 2026BIG TECHSamsung Puts Up To $100M Into Kairos's Google Reactor$100M (combined)→

All Coverage

Value Add Research

Kairos Power FAQ

Who founded Kairos Power?

Mike Laufer is CEO and co-founder.[3]

Where is Kairos Power headquartered?

Kairos Power's headquarters are in a converted aircraft hangar at the former Alameda Naval Air Station in California.[2]

What does Kairos Power do?

Hermes 2 is the first deployment under Kairos' agreement with Google to develop a fleet of advanced reactors.[1]

How much has Kairos Power raised?

Kairos Power has raised at least $70M in equity across 1 sourced funding round tracked by Value Add VC. The most recent was a $70M funding round in September 2026, reported by TechCrunch. Debt financing, tender offers and secondary sales are not counted.

Who invested in Kairos Power?

Lead investors in Kairos Power's sourced funding rounds include Samsung C&T. Per round: its September 2026 funding round was led by Samsung C&T.

When was Kairos Power founded and where is it based?

Kairos Power was founded in 2016 and is headquartered in Alameda, USA, according to Wikidata.

References

researched 2026-10-24
  1. Yahoo Finance
  2. Kairos Power
  3. world-nuclear-news.org
  4. biz.chosun.com
  5. Kairos Power
Sources & methodologyshow
Where these figures come from

Figures are labelled Reported (a source states it), Estimated, Derived (computed from other facts) or Rumored (in talks / unconfirmed). Rumors never replace a confirmed figure. Each figure keeps its own as-of date; history is preserved rather than overwritten.

How we verify data ·